{"id":17368,"date":"2026-02-27T13:47:42","date_gmt":"2026-02-27T09:47:42","guid":{"rendered":"https:\/\/innocom.ge\/?p=17368"},"modified":"2026-03-19T16:13:36","modified_gmt":"2026-03-19T12:13:36","slug":"rogor-shevarchiot-kontraqtori-it-infrastrukturistvis-chek-listi-damkvetistvis","status":"publish","type":"post","link":"https:\/\/innocom.ge\/en\/rogor-shevarchiot-kontraqtori-it-infrastrukturistvis-chek-listi-damkvetistvis\/","title":{"rendered":"How to Choose a Contractor for IT Infrastructure: A Checklist for the Client"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><div class=\"vc_row wpb_row vc_row-fluid\"><div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<h2>Why this choice costs more than it seems<\/h2>\n<p>The mistake of choosing a contractor for IT infrastructure costs the business not the value of the contract, but the cost of redoing it. A poorly designed cabling system, an overheated server room, or a network with Wi-Fi \"dead zones\" can lead to the need to redo everything from scratch. And as a rule, this happens at the customer's expense, because the previous contractor has already disappeared by that time or does not consider himself responsible.<br \/>\nHundreds of companies are engaged in system integration in the Georgian market: from lone installers to large integrators with certified engineers. The difference between them is not in the price lists, but in the approach to design, documentation and accountability for the result.<br \/>\nThis checklist will help you filter contractors before signing a contract. Through the eight criteria presented, we will try to convey our experience both in industrial projects and what we gained during independent audits.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" class=\"wp-image-17371\" src=\"https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/it-contractor-selection-checklist-infographic-8-criteria-icons-innocom-300x197.jpg\" alt=\"infographic checklist with 8 icons of criteria for choosing an IT contractor according to innocom\" width=\"463\" height=\"304\" srcset=\"https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/it-contractor-selection-checklist-infographic-8-criteria-icons-innocom-300x197.jpg 300w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/it-contractor-selection-checklist-infographic-8-criteria-icons-innocom-18x12.jpg 18w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/it-contractor-selection-checklist-infographic-8-criteria-icons-innocom-125x82.jpg 125w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/it-contractor-selection-checklist-infographic-8-criteria-icons-innocom.avif 702w\" sizes=\"(max-width: 463px) 100vw, 463px\" \/><\/p>\n<h2>Criterion 1. Sector-specific experience and not just \"IT experience\"<\/h2>\n<p>There are fundamental differences in the design of a bank's and a hotel's IT infrastructure. A bank requires shielded cabling systems (FTP\/STP), segmented routes, N+1 redundancy for power and cooling, and biometric access control to the server room. For hotels, it would be optimal to combine combined routes for PMS, Wi-Fi and video surveillance systems, a telephone hotel module, and resistance to high-density connections.<\/p>\n<p>The contractor who networked a 30-person office is not necessarily equipped to handle a manufacturing facility that requires protection from dust, vibration, and extended inter-building backbones.<\/p>\n<p><strong>What to ask:<\/strong> Request examples of projects implemented in your industry. Not \"we worked with banks,\" but specifically: what object, what scope, what standards were used.<\/p>\n<p>&nbsp;<\/p>\n<h2>Criterion 2. Project documentation before the start of work<\/h2>\n<p>A professional integrator starts not with installation, but with design. This means that before the first wall plug is hammered in, you get: a cable routing diagram, equipment specifications, load calculations, an access point or server rack layout plan.<\/p>\n<p>If a contractor suggests \"let's start and then see,\" you should really consider their professionalism. Mistakes at the planning stage <a href=\"https:\/\/innocom.ge\/en\/strukturirebuli-sakcable-sistemebi\/\">Structured cabling system<\/a> and <a href=\"https:\/\/innocom.ge\/en\/serveruli-da-sakomunikatsio-otakhebi\/\">Server room<\/a>\u00a0will cause problems that are difficult and expensive to fix. A properly designed SCS, compliant with TIA-568 and ISO\/IEC 11801 standards, lasts 15\u201320 years and allows you to replace active equipment without changing cables.<br \/>\n<strong><br \/>\nWhat to ask: <\/strong>Show us an example of the previous object's design documentation (without client confidential data). Do you have a process for preparing as-built documentation?<\/p>\n<p><img decoding=\"async\" class=\"wp-image-17372\" src=\"https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-26-300x197.jpg\" alt=\"IT infrastructure project documentation \u2014 network design blueprint and equipment specification\" width=\"491\" height=\"323\" srcset=\"https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-26-300x197.jpg 300w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-26-768x505.jpg 768w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-26-18x12.jpg 18w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-26-125x82.jpg 125w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-26.avif 986w\" sizes=\"(max-width: 491px) 100vw, 491px\" \/><\/p>\n<p>&nbsp;<\/p>\n<h2>Criterion 3. Certification of Engineers<\/h2>\n<p>Cisco (CCNA, CCNP), VMware (VCP-DCV), and Microsoft certifications are an important indicator that an engineer has undergone standardized training and passed an exam. In practice, this means that the person knows how to work with the protocol, knows documented best practices, and will not reinvent the \"wheel\" at your expense.<\/p>\n<p>Particular attention should be paid to partnerships with vendors. Partner status with Cisco, Fortinet, or SentinelOne gives the contractor access to solution testing (PoC), manufacturer's technical support and training, which directly affects the quality of implementation.<\/p>\n<p><strong>What to ask: <\/strong>What certifications do the engineers have? Does the company have partner status with the equipment manufacturers whose equipment is planned to be used?<\/p>\n<h2>Criterion 4. Full cycle or just installation<\/h2>\n<p>System integration is a consistent process: design \u2192 supply \u2192 installation \u2192 commissioning \u2192 documentation \u2192 support. If the contractor only closes one link (for example, only laying the cable), then you are responsible for the rest yourself. This means coordination between several contractors, vague responsibility, and no unified SLA.<\/p>\n<p>A company that takes a project from technical specifications to a working system and can service the result <a href=\"https:\/\/innocom.ge\/en\/it-autsorsingi\/\">\u10d0\u10e7\u10d5\u10d0\u10dc\u10d0<\/a> is responsible for the final result and not for a separate stage.<\/p>\n<p><strong>What to ask:<\/strong> Which stages do you handle yourself, and which ones do you subcontract? Do you have the possibility of IT outsourcing after the project is completed?<\/p>\n<h2>Criterion 5. Testing and certification after installation<\/h2>\n<p>After the completion of installation works, each line of the structured cabling system must be checked for compliance with standards (Cat5e, Cat6, Cat6A) using professional testers. The Fluke measurement protocol is a global standard, as well as the legal basis for warranty requirements for cable manufacturers.<\/p>\n<p><a href=\"https:\/\/innocom.ge\/en\/optikuri-qselebebi\/\">For fiber optic lines<\/a> OTDR reflectometry is mandatory across the entire route with a loss protocol. Without this data, you cannot prove that the connection problems are not caused by the quality of the installation, but, for example, by cable damage.<\/p>\n<p><strong>What to ask:<\/strong> Do you perform line certification? With what equipment? Is this included in the price, or is it paid separately? Do I receive measurement protocols?<\/p>\n<h2>Criterion 6. Guarantees and SLA terms<\/h2>\n<p>A \"one-year warranty on work\" without specifics is essentially marketing, not an obligation. A professional contractor specifies in the contract: the response time to an incident (from 30 minutes for critical ones), the scope of warranty work, communication channels, and the composition of planned maintenance work.<\/p>\n<p>If the contractor offers you <a href=\"https:\/\/innocom.ge\/en\/it-autsorsingi\/\">IT outsourcing<\/a> , pay attention to the existence of an SLA (Service Level Agreement) \u2014 a formalized agreement on the service level. Without an SLA, \"fast response\" and \"around-the-clock support\" remain just words.<\/p>\n<p><strong>What to ask:<\/strong> Show me the SLA template. What is the response time for a critical incident? What communication channels are available (phone, messenger, ticketing system)? What languages does support operate in?<\/p>\n<h2>Criterion 7. Transparency regarding equipment and vendors<\/h2>\n<p>The contractor should not impose a specific vendor without explaining the reasons. A professional approach implies the possibility of considering different options in different price categories, explaining the difference: from reliable enterprise solutions (Cisco, HP Aruba) to optimal price-quality systems (MikroTik, Ubiquiti) for small and medium-sized businesses. An experienced contractor understands the difference and where what is better, also where it is not worth overpaying and where it is not worth saving.<\/p>\n<p>A separate nuance for the Georgian market: saving on cable (using copper-clad aluminum CCA instead of pure copper) leads to hidden packet loss and network degradation. Make sure the specification indicates the specific type of cable with justification for the choice.<\/p>\n<p><strong>What to ask:<\/strong> Why do you recommend this particular vendor? What alternatives exist? Are you willing to work with the equipment already purchased by the client?<\/p>\n<p><img decoding=\"async\" class=\"wp-image-17373\" src=\"https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-27-300x219.jpg\" alt=\"Reliable vs risky IT contractor comparison documentation, certifications, SLA, industry experience\" width=\"430\" height=\"314\" srcset=\"https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-27-300x219.jpg 300w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-27-1024x747.jpg 1024w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-27-768x560.jpg 768w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-27-16x12.jpg 16w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-27-125x91.jpg 125w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-27.avif 1122w\" sizes=\"(max-width: 430px) 100vw, 430px\" \/><\/p>\n<h2>Criterion 8. Readiness for independent audit<\/h2>\n<p>The strongest indicator of a contractor's integrity is their attitude towards external inspection. A company that is confident in the quality of its work is not afraid of independent audits: neither at the design stage nor after the object is commissioned.<\/p>\n<p>This is especially relevant. <a href=\"https:\/\/innocom.ge\/en\/kiberusafrtkhoeba\/\">For cybersecurity<\/a> With the entry into force of the Law of Georgia on the Protection of Personal Data in 2024, companies are obliged not only to implement technical protection measures, but also to confirm compliance with the requirements. A contractor who implements security solutions must be prepared for their work to be inspected.<\/p>\n<p><strong>What to ask:<\/strong> Are you ready for an independent review of the work results? Will you provide us with a complete set of documentation sufficient for an audit?<\/p>\n<h2>How to use this list<\/h2>\n<p>It is not necessary to require the contractor to fully comply with all eight criteria. The purpose of the list is to help you structure the conversation and identify risk areas before entering into a contract.<\/p>\n<p>Three criteria that cannot be ignored under any circumstances: project documentation before work begins, testing after installation, and fixed warranty terms. Everything else depends on the scope and budget of the project.<\/p>\n<p>If you are evaluating a contractor for a complex project that involves implementation from cabling systems to cybersecurity, then it makes sense to start with a preliminary consultation. This allows you to understand the company's approach to design before a commercial offer. Innocom conducts such consultations free of charge and is ready to discuss tasks of any scale: from individual directions to a project that includes <a href=\"https:\/\/innocom.ge\/en\/it-servisebi\/\">Full IT infrastructure lifecycle<\/a> .<\/p>\n<p>Ltd <span style=\"font-weight: 400;\">\u00ab<\/span>Inokomi<span style=\"font-weight: 400;\">\u00bb<\/span> General Director Moris Melia.<\/p>\n\n\t\t<\/div>\n\t<\/div>\n<\/div><\/div><\/div><\/div><div class=\"vc_row wpb_row vc_row-fluid wpb_animate_when_almost_visible wpb_fadeIn fadeIn vc_custom_1494510617612 vc_row-o-equal-height vc_row-flex\"><div class=\"wpb_column vc_column_container vc_col-sm-12 vc_col-lg-6 vc_col-md-6 vc_col-has-fill\"><div class=\"vc_column-inner vc_custom_1496938621896\"><div class=\"wpb_wrapper\">\n\t\t<div id=\"wd-69a17d3fa0c62\" class=\"title-wrapper wd-wpb wd-set-mb reset-last-child  wd-rs-69a17d3fa0c62 wd-title-color-default wd-title-style-default text-left  wd-underline-colored\">\n\t\t\t\n\t\t\t<div class=\"liner-continer\">\n\t\t\t\t<h4 class=\"woodmart-title-container title  wd-font-weight- wd-fontsize-l\" >Frequently Asked Questions<\/h4>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\n\t\t\t\n\t\t\t\n\t\t<\/div>\n\t\t\n\t\t\n\t\t<div id=\"wd-618257e807c2a\" class=\"wd-accordion wd-wpb wd-rs-618257e807c2a  wd-style-default wd-titles-left wd-opener-pos-right wd-opener-style-arrow\" data-state=\"first\">\n\t\t\t\t\t\t\t\n\t\t\t\t\n\t\t\t\t<div class=\"wd-accordion-item\">\n\t\t\t\t\t<div class=\"wd-accordion-title wd-role-btn wd-active font-text wd-fontsize-s wd-font-weight-600\" data-accordion-index=\"0\" tabindex=\"0\">\n\t\t\t\t\t\t<div class=\"wd-accordion-title-text\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span>\n\t\t\t\t\t\t\t\tWhen is it necessary to involve an IT contractor during office renovations?\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<span class=\"wd-accordion-opener\"><\/span>\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<div class=\"wd-accordion-content wd-entry-content wd-active\" data-accordion-index=\"0\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p>At the architectural planning stage or before rough work begins. This allows you to install cable channels, allocate a room for the server, and agree on routes with builders without additional costs.<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\n\t\t\t\t\n\t\t\t\t<div class=\"wd-accordion-item\">\n\t\t\t\t\t<div class=\"wd-accordion-title wd-role-btn font-text wd-fontsize-s wd-font-weight-600\" data-accordion-index=\"1\" tabindex=\"0\">\n\t\t\t\t\t\t<div class=\"wd-accordion-title-text\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span>\n\t\t\t\t\t\t\t\tWhat cable channels are needed during the rough-in stage?\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<span class=\"wd-accordion-opener\"><\/span>\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<div class=\"wd-accordion-content wd-entry-content\" data-accordion-index=\"1\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p>Conduits and corrugated pipes for low-voltage cables (separate from high-voltage power), mounting boxes for network sockets, embedded parts for ceiling Wi-Fi access points with PoE, trunking channels from the server to work areas.<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\n\t\t\t\t\n\t\t\t\t<div class=\"wd-accordion-item\">\n\t\t\t\t\t<div class=\"wd-accordion-title wd-role-btn font-text wd-fontsize-s wd-font-weight-600\" data-accordion-index=\"2\" tabindex=\"0\">\n\t\t\t\t\t\t<div class=\"wd-accordion-title-text\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span>\n\t\t\t\t\t\t\t\tIs it possible to run IT cables after renovation?\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<span class=\"wd-accordion-opener\"><\/span>\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<div class=\"wd-accordion-content wd-entry-content\" data-accordion-index=\"2\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p>Technically yes, but this requires open cable channels for the final finishing, which is more expensive and looks unprofessional. Concealed wiring is only possible at the rough finishing stage.<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\n\t\t<\/div><\/div><\/div><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"\u10e0\u10d0\u10e2\u10dd\u10db \u10e6\u10d8\u10e0\u10e1 \u10d4\u10e1 \u10d0\u10e0\u10e9\u10d4\u10d5\u10d0\u10dc\u10d8 \u10d8\u10db\u10d0\u10d6\u10d4 \u10eb\u10d5\u10d8\u10e0\u10d8, \u10d5\u10d8\u10d3\u10e0\u10d4 \u10e9\u10d0\u10dc\u10e1 IT \u10d8\u10dc\u10e4\u10e0\u10d0\u10e1\u10e2\u10e0\u10e3\u10e5\u10e2\u10e3\u10e0\u10d8\u10e1\u10d7\u10d5\u10d8\u10e1 \u10d9\u10dd\u10dc\u10e2\u10e0\u10d0\u10e5\u10e2\u10dd\u10e0\u10d8\u10e1 \u10d0\u10e0\u10e9\u10d4\u10d5\u10d8\u10e1 \u10e8\u10d4\u10ea\u10d3\u10dd\u10db\u10d0 \u10d1\u10d8\u10d6\u10dc\u10d4\u10e1\u10e1 \u10d9\u10dd\u10dc\u10e2\u10e0\u10d0\u10e5\u10e2\u10d8\u10e1 \u10e6\u10d8\u10e0\u10d4\u10d1\u10e3\u10da\u10d4\u10d1\u10d0 \u10d9\u10d8 \u10d0\u10e0\u10d0, \u10d2\u10d0\u10d3\u10d0\u10d9\u10d4\u10d7\u10d4\u10d1\u10d8\u10e1 \u10e6\u10d8\u10e0\u10d4\u10d1\u10e3\u10da\u10d4\u10d1\u10d0","protected":false},"author":3,"featured_media":17375,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-17368","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-it-blogi"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/posts\/17368","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/comments?post=17368"}],"version-history":[{"count":5,"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/posts\/17368\/revisions"}],"predecessor-version":[{"id":17388,"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/posts\/17368\/revisions\/17388"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/media\/17375"}],"wp:attachment":[{"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/media?parent=17368"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/categories?post=17368"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/tags?post=17368"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}