{"id":17376,"date":"2026-02-27T14:47:46","date_gmt":"2026-02-27T10:47:46","guid":{"rendered":"https:\/\/innocom.ge\/?p=17376"},"modified":"2026-03-19T16:12:04","modified_gmt":"2026-03-19T12:12:04","slug":"it-infrastruktura-ofisis-msheneblobis-an-remontis-dros-ra-unda-gavitvalistsinot-samushaoebis-datskebamde","status":"publish","type":"post","link":"https:\/\/innocom.ge\/en\/it-infrastruktura-ofisis-msheneblobis-an-remontis-dros-ra-unda-gavitvalistsinot-samushaoebis-datskebamde\/","title":{"rendered":"IT Infrastructure During Office Construction or Renovation: What to Consider Before Starting Work"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><div class=\"vc_row wpb_row vc_row-fluid\"><div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<h2>Why is an IT contractor needed before starting repairs and not after?<\/h2>\n<p>A typical scenario looks like this: a company rents space, hires builders, does renovations, and moves in. After that, they call an IT contractor to \"get the internet up and running and set up a server.\" By this time, the walls are already closed, the ceiling is done, and cable channels either don't exist or are installed in the wrong place.<\/p>\n<p>The result is unfortunately predictable: cables run in open trays above the finishing, the server equipment stands in a utility room without ventilation, and Wi-Fi coverage works with \"dead zones\" because the access points are located without radio planning.<\/p>\n<p>All of this can be ruled out with one decision: involving an IT integrator at the design stage, before the rough work begins. In this article, we will discuss what should be considered and at what stage.<\/p>\n<p><img decoding=\"async\" class=\"wp-image-17377\" src=\"https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-30-300x200.jpg\" alt=\"Office construction IT infrastructure planning timeline when to involve IT contractor during renovation\" width=\"573\" height=\"382\" srcset=\"https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-30-300x200.jpg 300w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-30-1024x683.jpg 1024w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-30-768x512.jpg 768w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-30-1536x1024.jpg 1536w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-30-2048x1365.jpg 2048w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-30-18x12.jpg 18w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-30-1200x800.jpg 1200w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-30-125x83.jpg 125w\" sizes=\"(max-width: 573px) 100vw, 573px\" \/><\/p>\n<h2>Stage 1. Planning: When to involve an IT contractor<\/h2>\n<p>The ideal moment to attract an IT contractor coincides with the architectural planning stage or, at the very least, before the start of rough work. At this stage, it is still possible to influence the planning: allocating a room for the server, laying routes for cable channels, determining the location of power points for electrical panels and network equipment.<\/p>\n<p>What are the benefits of early involvement of an IT specialist:<\/p>\n<p>Agree on routes with the architect and builders. Cable channels do not intersect with power wiring, ventilation, and water supply. Calculate the number of network ports with a margin for growth. Practice shows that adding an additional 20\u201330% of ports during the construction phase is much cheaper than adding additional wiring after the renovation. <a href=\"https:\/\/innocom.ge\/en\/serveruli-da-sakomunikatsio-otakhebi\/\">Determining the location of the server room<\/a>\u00a0 Taking into account cooling, power supply, and access control requirements.<\/p>\n<p><strong>What is important to fix:<\/strong> The IT infrastructure technical task must be ready before the builders start working. This is a document, not a verbal agreement.<\/p>\n<h2>Stage 2. Rough finishing: What inserts are needed for IT<\/h2>\n<p>Rough finishing is the only stage when it is possible to lay hidden cable infrastructure without damaging the finished surface and the budget. After plastering the walls and covering the ceilings, any changes to the routes become a remodel.<\/p>\n<p>What should be included at this stage:<\/p>\n<p><strong>Cable channels and corrugated pipes.<\/strong> Routes for laying copper cable (Cat6\/Cat6A) and, if necessary, fiber optic cable. Channels must be separated from electrical wiring by at least 150 mm (TIA-568 standard) to avoid electromagnetic interference. If this is not done, the network will operate unstably and the cause will be very difficult to find.<\/p>\n<p><strong>Network socket boxes and flush-mounted elements.<\/strong> The number of workstations determines the number of ports. A minimum of two ports is recommended for each workstation: one for the computer, one spare. The number for conference rooms and common areas is calculated separately.<\/p>\n<p><strong>Wi-Fi access point docks.<\/strong> Access points are mounted on the ceiling and require PoE powered cabling. The location is determined based on radio planning, not \"by eye.\" Stable coverage cannot be guaranteed without prior calculations.<\/p>\n<p><strong>Route from the server room to the work zones.<\/strong> The main channels through which cables will run from the switching cabinet to the floors or wings of the building. The cross-section of the channel must be calculated with a margin: the cable tray should not be more than 40-50% full.<\/p>\n<p>For multi-story objects or buildings with several blocks, routes are laid at the rough processing stage <a href=\"https:\/\/innocom.ge\/en\/optikuri-qselebebi\/\">For fiber optic backbones<\/a> Optics provide bandwidth between floors and buildings that is unattainable with copper cabling over distances greater than 90 meters.<\/p>\n<p><img decoding=\"async\" class=\"wp-image-17378\" src=\"https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/blog-innocom-cable-tray-rough-construction-office-tbilisi-300x200.jpg\" alt=\"Cable tray and conduit installation during rough construction phase in Tbilisi office\" width=\"572\" height=\"381\" srcset=\"https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/blog-innocom-cable-tray-rough-construction-office-tbilisi-300x200.jpg 300w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/blog-innocom-cable-tray-rough-construction-office-tbilisi-1024x683.jpg 1024w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/blog-innocom-cable-tray-rough-construction-office-tbilisi-768x512.jpg 768w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/blog-innocom-cable-tray-rough-construction-office-tbilisi-18x12.jpg 18w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/blog-innocom-cable-tray-rough-construction-office-tbilisi-1200x800.jpg 1200w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/blog-innocom-cable-tray-rough-construction-office-tbilisi-125x83.jpg 125w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/blog-innocom-cable-tray-rough-construction-office-tbilisi.avif 1536w\" sizes=\"(max-width: 572px) 100vw, 572px\" \/><\/p>\n<h2>Stage 3. Server room: Building requirements<\/h2>\n<p>A server or communication room cannot be \"any free room.\" It is a technical space with specific requirements that must be considered during the planning phase.<\/p>\n<p><strong>Location.<\/strong> The server room should not be located near wet areas (bathrooms, kitchens) and under plumbing communications. Water leakage onto the server cabinet can damage the most expensive equipment in the office.<\/p>\n<p><strong>Area.<\/strong> For a small office (up to 50 employees), the minimum area is 4\u20136 sq.m. This is enough for 1\u20132 cabinets, a UPS, and basic air conditioning. For larger facilities, the area is calculated based on the TIA-942 standard, taking expansion plans into account.<\/p>\n<p><strong>Power supply.<\/strong> A separate power line from the panel, designed for the load of server equipment and cooling system. Uninterruptible power supply (UPS) with a power reserve of 20\u201330% from the current load.<\/p>\n<p><strong>Cooling.<\/strong> Server equipment emits significant heat. A household air conditioner is not designed for continuous operation in 24\/7 mode. Precision or semi-industrial air conditioning systems are used for servers.<\/p>\n<p><strong>Access control.<\/strong> A door with a lock, with an access control system or biometrics if necessary. Access to the server room must be restricted and logged.<\/p>\n<p>If these requirements are not considered during the design phase, it will later be impossible to allocate a suitable room and equip it properly, or it will require remodeling.<\/p>\n<h2>Five typical mistakes when planning an office IT infrastructure<\/h2>\n<p><span style=\"color: #333333; font-size: 16px;\">Error 1.<\/span><\/p>\n<p>Cable channels are installed, but not there. Builders install the channels in a route convenient for them, and not according to the routes agreed upon with the IT project. As a result, the cables bypass, and the length of the lines exceeds the permissible 90 meters (horizontal standard <a href=\"https:\/\/innocom.ge\/en\/strukturirebuli-sakcable-sistemebi\/\">For structured cabling systems<\/a> ), the signal will degrade.<\/p>\n<p><strong>Error 2.<\/strong><br \/>\n<strong>No space for the server room.<\/strong> The entire space is distributed between work areas, conference rooms, and a kitchen. A corner in the hallway or a utility room without ventilation is left for the server rack. The equipment overheats, breaks down, and after repairs, redoing the room costs much more than the initial planning.<\/p>\n<p><strong>Error 3.<\/strong><br \/>\n<strong>Wi-Fi access points are located without radio planning.<\/strong> Two access points \"for the whole office\" sounds economical. In practice, this leads to unstable connections in meeting rooms, dropped video calls, and employee complaints. A professional approach involves a radio survey of the building and <a href=\"https:\/\/innocom.ge\/en\/qseluri-aparatura\/\">Calculating corporate Wi-Fi coverage<\/a>\u00a0 Considering the density of walls, partitions, and equipment.<\/p>\n<p><strong>Error 4.<\/strong><br \/>\n<strong>Low current channels run alongside high voltage wiring.<\/strong> If cable channels are laid in the same tray as 220 V voltage cables, this creates electromagnetic interference. As a result, packet loss, connection instability, and speed reduction will be inevitable. The TIA-568 standard requires separation of low and high voltage power lines.<\/p>\n<p><strong>Error 5.<\/strong><br \/>\n<strong>Saving on cables.<\/strong> Using cheap Cat5e cable or copper-clad aluminum (CCA) instead of pure copper Cat6\/Cat6A makes it impossible to upgrade to 10 Gbps speeds in the future. The cabling system is installed for 15\u201320 years, and saving money on it turns into a complete replacement in 3\u20135 years.<\/p>\n<p><img decoding=\"async\" class=\"wp-image-17379\" src=\"https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-31-300x146.jpg\" alt=\"Common office IT infrastructure mistakes vs correct approach cabling, server room, Wi-Fi planning\" width=\"565\" height=\"275\" srcset=\"https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-31-300x146.jpg 300w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-31-1024x498.jpg 1024w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-31-768x374.jpg 768w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-31-18x9.jpg 18w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-31-1200x584.jpg 1200w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-31-125x61.jpg 125w, https:\/\/innocom.ge\/wp-content\/uploads\/2026\/02\/upscalemedia-transformed-31.avif 1508w\" sizes=\"(max-width: 565px) 100vw, 565px\" \/><\/p>\n<h2>Checklist of what to hand over to an IT contractor before starting a project<\/h2>\n<p>In order for an IT integrator to prepare project documentation, they need a minimum set of initial data:<\/p>\n<p>Room layout (floor plan with dimensions).<br \/>\n2. Number of workplaces with type indication (fixed, meeting room, reception, warehouse).<br \/>\n3. State growth plans for the next 2-3 years.<br \/>\n4. List of systems used: IP-telephony, video surveillance system, access control system, \"smart home\" system.<br \/>\n5. Requirements for server equipment (if any) or a description of the current infrastructure when migrating.<br \/>\n6. Information about the provider and communication channels.<\/p>\n<p>Based on this data, the contractor will develop a technical task, a cable routing diagram, equipment specifications, and an active equipment deployment plan.<\/p>\n<h2>Result<\/h2>\n<p>IT infrastructure should be designed in parallel with the renovation, not after it. Involving an IT contractor early on saves budget, eliminates rework, and ensures a system that will operate stably for many years.<\/p>\n<p>If your company is planning construction, an office move, or renovations, Innocom is ready to conduct a preliminary consultation and prepare technical specifications for the IT infrastructure. The initial consultation is free. We are in Tbilisi, but we work throughout Georgia.<\/p>\n<p><a href=\"https:\/\/innocom.ge\/en\/kontakti\/\">Task review \u2192<\/a><\/p>\n\n\t\t<\/div>\n\t<\/div>\n<\/div><\/div><\/div><\/div><div class=\"vc_row wpb_row vc_row-fluid wpb_animate_when_almost_visible wpb_fadeIn fadeIn vc_custom_1494510617612 vc_row-o-equal-height vc_row-flex\"><div class=\"wpb_column vc_column_container vc_col-sm-12 vc_col-lg-6 vc_col-md-6 vc_col-has-fill\"><div class=\"vc_column-inner vc_custom_1496938621896\"><div class=\"wpb_wrapper\">\n\t\t<div id=\"wd-69a17a7fca1b7\" class=\"title-wrapper wd-wpb wd-set-mb reset-last-child  wd-rs-69a17a7fca1b7 wd-title-color-default wd-title-style-default text-left  wd-underline-colored\">\n\t\t\t\n\t\t\t<div class=\"liner-continer\">\n\t\t\t\t<h4 class=\"woodmart-title-container title  wd-font-weight- wd-fontsize-l\" >Frequently Asked Questions<\/h4>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\n\t\t\t\n\t\t\t\n\t\t<\/div>\n\t\t\n\t\t\n\t\t<div id=\"wd-618257e807c2a\" class=\"wd-accordion wd-wpb wd-rs-618257e807c2a  wd-style-default wd-titles-left wd-opener-pos-right wd-opener-style-arrow\" data-state=\"first\">\n\t\t\t\t\t\t\t\n\t\t\t\t\n\t\t\t\t<div class=\"wd-accordion-item\">\n\t\t\t\t\t<div class=\"wd-accordion-title wd-role-btn wd-active font-text wd-fontsize-s wd-font-weight-600\" data-accordion-index=\"0\" tabindex=\"0\">\n\t\t\t\t\t\t<div class=\"wd-accordion-title-text\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span>\n\t\t\t\t\t\t\t\tWhen is it necessary to involve an IT contractor during office renovations?\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<span class=\"wd-accordion-opener\"><\/span>\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<div class=\"wd-accordion-content wd-entry-content wd-active\" data-accordion-index=\"0\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p>At the architectural planning stage or before rough work begins. This allows you to install cable channels, allocate a room for the server, and agree on routes with builders without additional costs.<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\n\t\t\t\t\n\t\t\t\t<div class=\"wd-accordion-item\">\n\t\t\t\t\t<div class=\"wd-accordion-title wd-role-btn font-text wd-fontsize-s wd-font-weight-600\" data-accordion-index=\"1\" tabindex=\"0\">\n\t\t\t\t\t\t<div class=\"wd-accordion-title-text\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span>\n\t\t\t\t\t\t\t\tWhat cable channels are needed during the rough-in stage?\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<span class=\"wd-accordion-opener\"><\/span>\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<div class=\"wd-accordion-content wd-entry-content\" data-accordion-index=\"1\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p>Conduits and corrugated pipes for low-voltage cables (separate from high-voltage power), mounting boxes for network sockets, embedded parts for ceiling Wi-Fi access points with PoE, trunking channels from the server to work areas.<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\n\t\t\t\t\n\t\t\t\t<div class=\"wd-accordion-item\">\n\t\t\t\t\t<div class=\"wd-accordion-title wd-role-btn font-text wd-fontsize-s wd-font-weight-600\" data-accordion-index=\"2\" tabindex=\"0\">\n\t\t\t\t\t\t<div class=\"wd-accordion-title-text\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span>\n\t\t\t\t\t\t\t\tIs it possible to run IT cables after renovation?\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<span class=\"wd-accordion-opener\"><\/span>\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<div class=\"wd-accordion-content wd-entry-content\" data-accordion-index=\"2\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p>Technically yes, but this requires open cable channels for the final finishing, which is more expensive and looks unprofessional. Concealed wiring is only possible at the rough finishing stage.<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\n\t\t<\/div><\/div><\/div><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"\u10e0\u10d0\u10e2\u10dd\u10db \u10d0\u10e0\u10d8\u10e1 IT-\u10d9\u10dd\u10dc\u10e2\u10e0\u10d0\u10e5\u10e2\u10dd\u10e0\u10d8 \u10e1\u10d0\u10ed\u10d8\u10e0\u10dd \u10e0\u10d4\u10db\u10dd\u10dc\u10e2\u10d8\u10e1 \u10d3\u10d0\u10ec\u10e7\u10d4\u10d1\u10d0\u10db\u10d3\u10d4 \u10d3\u10d0 \u10d0\u10e0\u10d0 \u10db\u10d8\u10e1 \u10e8\u10d4\u10db\u10d3\u10d4\u10d2 \u10e2\u10d8\u10de\u10e3\u10e0\u10d8 \u10e1\u10ea\u10d4\u10dc\u10d0\u10e0\u10d8 \u10d0\u10e1\u10d4 \u10d2\u10d0\u10db\u10dd\u10d8\u10e7\u10e3\u10e0\u10d4\u10d1\u10d0: \u10d9\u10dd\u10db\u10de\u10d0\u10dc\u10d8\u10d0 \u10e5\u10d8\u10e0\u10d0\u10dd\u10d1\u10e1 \u10e4\u10d0\u10e0\u10d7\u10e1, \u10e5\u10d8\u10e0\u10d0\u10dd\u10d1\u10e1 \u10db\u10e8\u10d4\u10dc\u10d4\u10d1\u10da\u10d4\u10d1\u10e1, \u10d0\u10d9\u10d4\u10d7\u10d4\u10d1\u10e1","protected":false},"author":3,"featured_media":17380,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-17376","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-it-blogi"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/posts\/17376","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/comments?post=17376"}],"version-history":[{"count":5,"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/posts\/17376\/revisions"}],"predecessor-version":[{"id":17385,"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/posts\/17376\/revisions\/17385"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/media\/17380"}],"wp:attachment":[{"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/media?parent=17376"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/categories?post=17376"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/innocom.ge\/en\/wp-json\/wp\/v2\/tags?post=17376"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}